Major Client Laverton
We have carried out works at Murrin Murrin for several years.
These works include the replacement of roof, structural purlins, mesh, insulation and flashings on multiple buildings on site, including above ‘live’ conveyor belts, above tanks still full with water, above substations and large storage tanks.
We have carried out comprehensive works in all areas of this site.
- Roof Replacement
- Replacement of Structural Purlins
- Mesh Replacement
- Replacement of Insulation and flashings on multiple buildings on site
- Including above ‘live’ conveyor belts, above tanks still full with water, above substations and large storage tanks.